Seasonal and event-related maintenance and upgrades project work scheduled for Volant.
Legend:
| White = items to do
| Gold = tasks on deck for the next work party
| Green = completed
| Cyan = deferred because of low priority
| Pink = discretionary and not safety-related
PRE-LAUNCH SPRING COMMISSIONING
- Clean and kill mildew in the cabin interior.
- Clean the bilge.
- Clean the hull scum line.
- Effect necessary repair to keel/hull joint.
- Light sand the bottom in prep for bottom paint.
- Clean up the propeller and sail drive.
- Remove and replace zinc anode, if necessary.
- Compound the hull topsides.
- Wax the hull topsides.
- Apply anti-fouling bottom paint.
- Bring necessary safety gear on board.
- Re-install the steering wheel.
- Measure rudder deflection angle and mark steering wheel.
- Install dock lines and fenders at the slip.
- Store maintenance gear in the dock box.
- Inspect the engine water pump impellor.
- Replace fuel filters and air filter.
SPRING POST LAUNCH
- Re-install the running rigging.
- Install guide rings for outhaul and reefs at mast base.
- Clean and dry the bilge.
- Adjust the rig and re-attach shroud base covers.
- Test the electronics.
- Bring remaining sails aboard.
- Bring remaining necessary sailing gear aboard.
- Secure shore power cord at the dock.
- Bring cushions aboard.
- Replace both spinnaker snap shackles.
- Modify filler piece for oven/stove top grate.
SECURE AT THE DOCK AFTER SAILING
- Secure spring line, bow dock lines, and stern dock lines.
- Ease the backstay tension to light setting.
- Attach cover for mainsail.
- Attach jib sock using red Spin 2 halyard, tightening white and black lines to prevent flapping.
- Apply covers for instruments at mast, helm station, and compass.
- Attach bungee cord to steering wheel to limit it turning.
- Connect shore power cable.
- On distribution panel, check that REVERSE POLARITY is not illuminated. Then, turn on BATTERY CHARGER.
- On distribution panel, turn off all DC switches except FRIDGE UNIT.
- Turn off the Garmin chartplotter on the unit.
- Coil the mainsheet.
- Secure the mainsail traveler lines to hold the traveler car from moving.
- Coil lines in the cockpit.
- Install all 3 hatch boards and lock the padlock.
PREP FOR OFFSHORE PASSAGE
- Sanitize the water tank and add water.
- Sanitize the toilet.
- Clean and dry the bilges.
- Bring offshore gear aboard: shore power cord, storm jib, jacklines, tethers, backup nav lights, radar reflector.
- Charge flashlights and searchlight.
- Replace propane tank with the spare, if needed.
- Refuel, if needed.
- Bring additional galley gear aboard.
- Bring bedding gear aboard.
- Stock provisions.
FALL HAUL-OUT PREP
- Unload cabin cushions.
- Replace steel steering wheel with carbon fiber wheel.
- Charge the house batteries.
- Unload remaining sails and re-flake as needed.
- Pack and unload safety gear, sailing gear, life jackets, nav station, galley, head.
- Add cleaner to the bilges.
- Empty the water tank.
- Unload the ice box.
- Install the winter hatch board.
- Change the engine oil and filter.
- Leave on board: cleaners, bosun's chair, light lines, tools, hand bilge pumps, towels.
- Remove the boom along with mainsheet, vang, outhaul, reef lines.
- Remove the running rigging and hardware on deck.
- Grease the jackscrews on the cradle.
- Remove cross brace on the cradle.
- Bring antifreeze aboard.
- Install flopper stopper on headstay.
- Unload the propane tank.
- Stage ladder, cable, and lock for the cradle.
- Attach dock lines and fenders on the boat for haul-out.
- Add biocide to the fuel tank (just before refueling).
- Refuel diesel to 7/8 tank capacity (at haul-out dock).
- Pump out the holding tank.
AFTER HAUL-OUT / WINTER PREP
- Remove dock lines and fenders from the slip.
- Empty the dock box.
- Turn off the house batteries.
- Unload the steering wheel.
- Cover or remove the mast instruments.
- Reduce rig tension.
- Run messengers for some running rigging.
- Add antifreeze to the water tank.
- Pump remaining water from the bilges and add antifreeze.
- Pump some antifreeze through the bilge pumps.
- Set water absorbent trays in the cabin.
- Fabricate and install a wheel well cover.
WINTER 2026/2027 PROJECTS
- Arrange for pickup for any sails that need evaluation or repair.
- Fix gaskets for ports.
- Scope gelcoat repair for surface cracks in the cockpit at companionway.
- Repair clear coat abrasion at front of mast.
- Reseal mast base water barrier.
- Replace the cabin spot light units. (Parts are in now.)
- Replace reef clew lines inside the boom.
- Rig and replace outhaul block and tackle inside the boom. (Parts are in now).
- Buy spare keys for steering wheel shaft.
- Install new glow-fast rope clutch labels. (Parts are in now.)
- Re-glue the vinyl hull covering in the head.
- Repair/replace the boom vang. (Parts are ordered.)
- Repair/replace the Weems & Plath clock. (Parts are in now.)
- Install mainsheet traveler line locks. (Parts are in now.)
- Change cockpit line holders. (Parts are in now.)
- Re-paint the boom.
- Rig brag flags strings. (Line is in now.)
- Fix mount for race countdown timer.
- Order new mainsail in time for Quantum fall discount.
➖➖➖
If you are curious about the complete list of tasks we performed preparing Volant during the winter of 2022 and spring 2023 for her long maiden voyage from Lake Ontario to Lake Michigan, for example, if you own a sailboat or are contemplating purchasing one and might need a reality check (!), here is a detailed task list of commissioning work on Volant. That list is current up through June 2023; I will not be maintaining it.
[Updated October 30, 2026]